Showing posts with label San Augustine County. Show all posts
Showing posts with label San Augustine County. Show all posts

Friday, August 20, 2010

San Augustine County, TX: Bossier Shale Update: Crimson Exploration

By Andrea: http://oilshalegas.com

Crimson Exploration Inc. (CXPO) announced today, August 18, 2010 that it completed it's first well in San Augustine County, TX in the mid-bossier shale. Press release below:

In San Augustine County, Crimson Exploration Inc. (CXPO) successfully completed its first operated well in the Bruin Prospect Area. The Grizzly #1 (55% WI) was drilled to a measured depth of 18,100 feet with an approximate 4,200-foot horizontal lateral in the Mid Bossier Shale and was completed with 14 frac stages. The Grizzly #1 continues to clean up and is currently producing at a gross restricted rate of approximately 11.5 MMcfd on a 16/64" choke with around 9,100 psi flowing casing pressure.

Mr. Allan D. Keel, Crimson's President and CEO, stated, "With the successful completion of the Grizzly #1 well, Crimson has validated the reserve potential of the Mid Bossier Shale in its Bruin Prospect Area." Mr. Keel went on to say "based on well performance, we could have flowed the Grizzly well at significantly higher rates but have decided to use industry-best practices for reservoir optimization to maximize ultimate recovery." With respect to the recent successes in the Schwarz #2 and Catherine Henderson A-7 wells, Mr. Keel said, "The successful execution of our Liberty County drilling program continues to provide Crimson with the production and cashflow base that allows us to continue our Haynesville and Eagle Ford Shale development as well as pursue additional growth opportunities within our deep inventory of lower risk, high quality conventional prospects."

The 11.5 MMcfd test rate on the Grizzly well is reflective of Crimson's strategy that restricting rate and pressure drawdown on Haynesville and Mid Bossier Shale wells increases the Estimated Ultimate Recovery (EUR), results in a shallower and more stable decline curve, and delays the need for costly compression. Crimson adopted this strategy based on the experience attained by other operators in this trend, core studies that substantiate the loss of fracture conductivity at higher initial drawdown rates, and service company studies that indicate potential pinching off of available reservoir at higher production rates. Data from wells produced at restricted rates in the trend suggest that although this methodology provides lower production in the first few months of flow, the cumulative production curve compared to higher rate wells crosses in less than a year with the restricted rate wells flowing at higher rates and pressures at the point they cross, substantiating the belief that EUR is benefited at little to no loss of present value.

For more shale updates, visit: http://blackberrystocks.blogspot.com

For more stock updates, visit: http://daytradingstockblog.blogspot.com


Tuesday, August 10, 2010

San Augustine County, TX: Bossier Shale Update


Crimson Exploration Inc. (CXPO) released an update on the Bossier Shale located in San Augustine County, TX:

Crimson is currently finalizing the completion of the Grizzly well (55% WI) in its Bruin Prospect Area in San Augustine County, Texas. The Grizzly is the first Crimson-operated well in the Bruin Prospect and has a surface location approximately 2.5 miles south of the Kardell (52% WI) well drilled in 2009. The Grizzly was drilled to a total measured depth of 18,100 feet, which includes a lateral of approximately 4,200 feet in the Mid Bossier Shale. The well was completed with 14 frac stages. Crimson was able to drill and case the Grizzly in 60 days, an improvement of 30 days compared to the Kardell. Flowback operations have commenced, and consistent with our strategy to maximize the ultimate recovery, we are methodically increasing the choke size, and monitoring pressure and rate at each step. We are very encouraged with the pressure and rate response and expect to have the well tested and flowing at a sustained rate in approximately two weeks, at which time the results will be reported. Production during the testing phase is being flowed into the sales line.

The Gobi (73% WI), the Company's second operated well in the Bruin Prospect Area, has reached a total vertical depth of approximately 13,900 feet in the pilot hole with drilling of the 4,500 foot lateral in the Mid-Bossier Shale expected to commence soon. Gobi is located approximately 2 miles northwest of the Grizzly. Initial completion of the Gobi is scheduled to begin in October, with results expected to be announced in November.

For more shale updates, visit: http://blackberrystocks.blogspot.com

For more stock updates, visit: http://daydradingstockblog.blogspot.com