Showing posts with label vertical well. Show all posts
Showing posts with label vertical well. Show all posts

Wednesday, September 1, 2010

Lee County, Texas - Austin Chalk Formation Update

By Andrea: http://oilshalegas.com

Buccaneer Energy Limited (BCGYF.PK) recently announced the progress of 2 wells in Lee County, Texas in both the Austin Chalk and Eagle Ford shale.

The Alexander # 1 well site location has been built over the last week and the Nicklos # 1 Rig is moving in and rigging up to drill.
The Alexander # 1 well is the third well in the Lee County drilling program and is expected to spud within the next 24 hours.The vertical component of the well is anticipated to have a total depth of 5,800' and will penetrate the Austin Chalk and Eagle Ford shale. Logs will then be run before a 1,500' - 2,500' horizontal component is drilled in the Austin Chalk formation.

The vertical component is expected to take 7-10 days to drill and the horizontal component an additional 15-18 days.

Drilling updates will be made each Wednesday.

For more shale updates, visit: http://blackberrystocks.blogspot.com

For more stock updates, visit: http://daytradingstockblog.blogspot.com

Sunday, August 29, 2010

Lee County, Texas: Eagle Ford Shale Update

By Andrea: http://oilshalegas.com

Buccaneer Energy Limited (BCGYF.PK) recently announced the progress of 2 wells in Lee County, Texas in both the Austin Chalk and Eagle Ford shale.

The Alexander # 1 well site location has been built over the last week and the Nicklos # 1 Rig is moving in and rigging up to drill.
The Alexander # 1 well is the third well in the Lee County drilling program and is expected to spud within the next 24 hours.The vertical component of the well is anticipated to have a total depth of 5,800' and will penetrate the Austin Chalk and Eagle Ford shale. Logs will then be run before a 1,500' - 2,500' horizontal component is drilled in the Austin Chalk formation.

The vertical component is expected to take 7-10 days to drill and the horizontal component an additional 15-18 days.

Drilling updates will be made each Wednesday.

For more shale updates, visit: http://blackberrystocks.blogspot.com

For more stock updates, visit: http://daytradingstockblog.blogspot.com

Tuesday, August 10, 2010

Bee County, Texas: Eagle Ford Shale Update

By Andrea: http://oilshalegas.com

Crimson Exploration Inc. (CXPO) has released an update on the Eagle Ford shale. They will be drilling their first Eagle Ford shale well in Bee County, Texas:

Crimson Exploration Inc. (CXPO)C is currently participating (20% WI) in its first horizontal Eagle Ford Shale well in Bee County, Texas. The Windham #1, operated by Petrohawk, has a rig on location and is expected to spud in the next couple of days. This location is near the Dubose #1 vertical well that Crimson drilled and tested in late 2009. Drilling and completion results are expected in the fourth quarter of this year for the Windham #1. A second well (20% WI) may spud during November 2010 on another portion of Crimson's leasehold in Bee County.

For more shale updates, visit: http://blackberrystocks.blogspot.com

For more stock updates, visit: http://daytradingstockblog.blogspot.com