Showing posts with label CXPO. Show all posts
Showing posts with label CXPO. Show all posts

Tuesday, August 10, 2010

Bee County, Texas: Eagle Ford Shale Update

By Andrea: http://oilshalegas.com

Crimson Exploration Inc. (CXPO) has released an update on the Eagle Ford shale. They will be drilling their first Eagle Ford shale well in Bee County, Texas:

Crimson Exploration Inc. (CXPO)C is currently participating (20% WI) in its first horizontal Eagle Ford Shale well in Bee County, Texas. The Windham #1, operated by Petrohawk, has a rig on location and is expected to spud in the next couple of days. This location is near the Dubose #1 vertical well that Crimson drilled and tested in late 2009. Drilling and completion results are expected in the fourth quarter of this year for the Windham #1. A second well (20% WI) may spud during November 2010 on another portion of Crimson's leasehold in Bee County.

For more shale updates, visit: http://blackberrystocks.blogspot.com

For more stock updates, visit: http://daytradingstockblog.blogspot.com

San Augustine County, TX: Bossier Shale Update


Crimson Exploration Inc. (CXPO) released an update on the Bossier Shale located in San Augustine County, TX:

Crimson is currently finalizing the completion of the Grizzly well (55% WI) in its Bruin Prospect Area in San Augustine County, Texas. The Grizzly is the first Crimson-operated well in the Bruin Prospect and has a surface location approximately 2.5 miles south of the Kardell (52% WI) well drilled in 2009. The Grizzly was drilled to a total measured depth of 18,100 feet, which includes a lateral of approximately 4,200 feet in the Mid Bossier Shale. The well was completed with 14 frac stages. Crimson was able to drill and case the Grizzly in 60 days, an improvement of 30 days compared to the Kardell. Flowback operations have commenced, and consistent with our strategy to maximize the ultimate recovery, we are methodically increasing the choke size, and monitoring pressure and rate at each step. We are very encouraged with the pressure and rate response and expect to have the well tested and flowing at a sustained rate in approximately two weeks, at which time the results will be reported. Production during the testing phase is being flowed into the sales line.

The Gobi (73% WI), the Company's second operated well in the Bruin Prospect Area, has reached a total vertical depth of approximately 13,900 feet in the pilot hole with drilling of the 4,500 foot lateral in the Mid-Bossier Shale expected to commence soon. Gobi is located approximately 2 miles northwest of the Grizzly. Initial completion of the Gobi is scheduled to begin in October, with results expected to be announced in November.

For more shale updates, visit: http://blackberrystocks.blogspot.com

For more stock updates, visit: http://daydradingstockblog.blogspot.com